Norman Road, Royal Borough of Greenwich
Southdowns was commissioned by The Edition Group to prepare an air quality assessment for a
St. Helier Hospital, London Borough of Sutton
Southdowns was commissioned by Breathe Energy Limited to prepare an air quality assessment of the
The Oval Village, Lambeth
A major new community development in central London with c. 1,300 new homes, a community
University of Sussex – Indoor Air Quality Assessment
Southdowns was commissioned by the University of Sussex to investigate indoor air quality within an
Thameslink – London Bridge Station Redevelopment
Southdowns was commissioned by Costain as Environmental Monitoring Specialists to undertake noise, vibration, dust and
1 King William Street
Southdowns was appointed by McLaren Construction in 2014 to prepare a noise, dust and vibration
London Wall Place
Southdowns was commissioned to complete a noise, dust and vibration management plan (NDVMP) by Brookfield
Goodman’s Fields, London
The client is currently developing the Goodman’s Fields site which will be a mixed use
Queensland Road Development, London
Kier London has signed a GBP 15m enabling works contract for the development of the
Channel Tunnel Rail Link – Rail Link Engineering
Southdowns staff began working with RLE in 1997 at the early stage of detailed design.
St Pancras International Station
Southdowns was initially appointed by the contractor to provide specialist input to the Section 61
Bracknell Town Centre Masterplan
Southdowns was instructed on behalf of Bracknell Forest Borough Council to undertake a noise impact