Southdowns was appointed to advise on the likely noise impact associated with the commissioning phases of the project, including the de-watering, drying, de-pressurisation (using silenced venting) and gassing of the pipeline. The activities were assessed in accordance with the site Code of Practice and consideration of other cumulative operations at the terminal.