Channel Tunnel Rail Link Contractors

Prev
Next

Contract 310

The C310 civil engineering contractor was required to construct a large piled slab across the Rainham marshes to provide a structurally robust platform for the new high speed railway as well as other structures and earthworks. Southdowns was involved in the initial negotiations with the local authorities on, and the development of, Section 61 applications for the works and the provision of advice on monitoring protocols.

Other issues involved concerns over vibration induced damage as a result of vibratory and percussively driven piling activities. An empirically derived prediction model was developed to enable the prediction of vibration from vibratory driven sheet piles for both disturbance and damage purposes. Elsewhere both Transco and Thames Water required strict monitoring of vibration during the percussive driving of large diameter pre-cast concrete piles across the marshes. Southdowns undertook the measurements and were able to assess the risk of damage to the pipelines and direct the piling operations accordingly in real-time as each pile was inserted.

Contract 576

C576 was responsible for the main track and overhead catenary system (OCS) installation for Section 2 of the Channel Tunnel Rail Link running from Pepper Hill in North Kent to St Pancras Station in London.

C576 operations involved constructing and operating major temporary railheads and material transfer sites in potentially sensitive areas, to service the track and OCS installation works along the CTRL trace.

closely with C576 engineers, Southdowns developed detailed noise calculation procedures for construction activities and for assessing the movement of engineering trains along the trace during sensitive periods of the day and night. The models were used to optimise the contractors’ construction methodologies and sequencing. Southdowns was responsible for generating construction noise and vibration management documentation for all the proposed works as well as developing the Section 61 consent applications. Noise and vibration monitoring was undertaken on this project.

Contract 588

C588 was responsible for the mechanical and electrical fit out for Section 2 of CTRL. This included the installation of in-tunnel ventilation equipment, ventilation shaft equipment, shaft headhouse structures, signalling rooms, control and communications rooms and various lineside works such as cable laying and the installation of signalling equipment.

The majority of the main C588 worksites were situated in predominantly high density residential areas with sensitive receivers in close proximity. Southdowns was responsible for developing Section 61 consent applications, advising on BPM measures including screening requirements and appropriate measures to remain within the Projects noise commitments. Southdowns also provided expert training for the contractor’s staff on noise monitoring and assisted in the procurement of monitoring equipment on its behalf.

Contract 105

Contract 105 was responsible for the refurbishment of the St Pancras station concourse and undercroft areas, and also for the new extension to the station required to accommodate the Eurostar trains. Southdowns undertook Section 61 calculations during the main civils work stages.

Related Projects

HS2 Central Section C1 – Stage 1 Noise and AQ Consultant

HS2 South Sections S1 and S2 – Noise and Vibration Monitoring

HS2 Central Sections C2 and C3 – Noise Vibration & Air Quality Framework

HS2 Colne Valley Viaduct – Noise Barriers

Our Services
  • Planning and EIA
  • Modelling and Prediction
  • Mitigation Design
  • Expert Witness
  • Building & Architectural Accoustics
  • Tender / Bid Support
  • Construction Management
  • See All Services
Information
  • About Us
  • Clients
  • Contact Us
  • News
  • Website Privacy and Cookie Policy
Get in Touch
General
  • Richard Grove
  • Richard.Grove@rwdi.com
  • 020 4570 6844
  • Matthew Weston
  • Matthew.Weston@rwdi.com
  • 01273 942501
  • Rick Methold
  • Rick.Methold@rwdi.com
  • 01273 942505
association noise consultants
Get in Touch
Noise, Acoustics & Vibration
  • Alex Mabey
  • Alex.Mabey@rwdi.com
  • 01273 013146
  • Rick Methold
  • Rick.Methold@rwdi.com
  • 01273 942505
Air Quality
  • Matthew Weston
  • Matthew.Weston@rwdi.com
  • 01273 942501
  • Rick Methold
  • Rick.Methold@rwdi.com
  • 01273 942505
Southdowns environmental consultants logo

Reg No. 3150111 © Copyright 2025 RWDI Southdowns Environmental Consultants Ltd | All Rights Reserved.

Designed & Maintained by PC Consultants
Southdowns use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies. However, you may visit "Cookie Settings" to provide a controlled consent.
Cookie SettingsAccept All
Manage Privacy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT