Northern Line Extension

Prev
Next

Southdowns was appointed by CH2M Hill to support the BAM Nuttall Balfour Beatty Joint Venture (BBB JV) in 2013 during its tendering for the £900m design and build contract for the proposed LU Northern Line Extension.

The new 3.5km extension in twin bored tunnel will link the existing Northern Line station and turnback loop at Kennington to new stations at Nine Elms and Battersea.

CH2M Hill was appointed as the main design consultant by the BBB JV during tendering and was responsible for tunnels, stations and trackform. The JV was one of the 2 bidders going into the final round of tender evaluation, and a considerable quantity of vibro-acoustical design work was completed.

Southdowns was appointed to determine the necessary vibro-acoustic mitigation requirements for the track-form to ensure compliance with the projects commitments and to participate in the engineering design for the track and tunnels accordingly.

The NLE scheme is considerably challenging from an acoustical perspective. The committed design criteria for groundborne noise levels in buildings during operation represent the most onerous ever implemented in the UK and, also uniquely for the UK, the design will be tested for compliance with post commissioning compliance monitoring.

As a consequence there was a clear need to manage risk from the outset during the tunnel and track form design for the BBB JV. Major areas of risk were identified including: the need to consider the FAST (125ms) time weighting for groundborne noise which is more sensitive to impulsive events; reliance on a theoretical models and the resulting absolute groundborne noise and vibration levels for determining track-form mitigation requirements; presence of major step plate junctions (and hence impulsive vibration sources) beneath residential areas; major new high rise development already being built along the NLE corridor with deep piled foundations; and unknown Over-site Development at the stations.

To manage risk, field surveys on the surface close to the existing Northern Line operations were undertaken to obtain vibration source reference data.

Southdowns’ in-house software was used to compute the vibration difference functions taking into account the known changes in parameters of interest for the existing Northern Line operations during the surveys (e.g. speeds, rolling stock, rail/wheel roughness, track support systems, presence of S&C) and those proposed for the NLE.

The computations were then used to test a suite of possible practicable track form solutions including: resilient baseplates; resilient rail-chairs; booted sleepers; and floating track slab for all of the receptor locations along the route including those with planning permission.

The design was developed on the basis of a standard track form over the majority of the length of the new tunnels with an initial enhanced floating track slab design developed at critical areas including the new step plate junctions and the stations.

Southdowns staff were tasked with developing a detailed approach and methodology process map to set out the technical work scope required to minimise risk during the detailed design. Based upon the assessed residual risk levels, a method based upon acquiring further empirical data was developed to ensure that the model could be calibrated and that quantifiable uncertainty could be defined and applied to the expected groundborne noise and vibration magnitudes.

Related Projects

HS2 Central Section C1 – Stage 1 Noise and AQ Consultant

HS2 South Sections S1 and S2 – Noise and Vibration Monitoring

HS2 Central Sections C2 and C3 – Noise Vibration & Air Quality Framework

HS2 Colne Valley Viaduct – Noise Barriers

Our Services
  • Planning and EIA
  • Modelling and Prediction
  • Mitigation Design
  • Expert Witness
  • Building & Architectural Accoustics
  • Tender / Bid Support
  • Construction Management
  • See All Services
Information
  • About Us
  • Clients
  • Contact Us
  • News
  • Website Privacy and Cookie Policy
Get in Touch
General
  • Richard Grove
  • Richard.Grove@rwdi.com
  • 020 4570 6844
  • Matthew Weston
  • Matthew.Weston@rwdi.com
  • 01273 942501
  • Rick Methold
  • Rick.Methold@rwdi.com
  • 01273 942505
association noise consultants
Get in Touch
Noise, Acoustics & Vibration
  • Alex Mabey
  • Alex.Mabey@rwdi.com
  • 01273 013146
  • Rick Methold
  • Rick.Methold@rwdi.com
  • 01273 942505
Air Quality
  • Matthew Weston
  • Matthew.Weston@rwdi.com
  • 01273 942501
  • Rick Methold
  • Rick.Methold@rwdi.com
  • 01273 942505
Southdowns environmental consultants logo

Reg No. 3150111 © Copyright 2025 RWDI Southdowns Environmental Consultants Ltd | All Rights Reserved.

Designed & Maintained by PC Consultants
Southdowns use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies. However, you may visit "Cookie Settings" to provide a controlled consent.
Cookie SettingsAccept All
Manage Privacy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT