Norman Road, Royal Borough of Greenwich
Southdowns was commissioned by The Edition Group to prepare an air quality assessment for a
The Icon, Lytton Way, Stevenage
Southdowns was commissioned by Hill Residential Ltd to produce an air quality assessment for a
The Oval Village, Lambeth
A major new community development in central London with c. 1,300 new homes, a community
Young Street – Residential Development
Southdowns was commissioned to complete a noise, dust and vibration management plan (NDVMP) by Grainger
Northolt Road – Air Quality Assessment
Southdowns was commissioned to provide an air quality assessment to accompany the planning application for
1 King William Street
Southdowns was appointed by McLaren Construction in 2014 to prepare a noise, dust and vibration
London Wall Place
Southdowns was commissioned to complete a noise, dust and vibration management plan (NDVMP) by Brookfield
Honey Farm – Air Pollution & Nitrogen Deposition
Southdowns was commissioned by Pelham Holdings to establish the Critical Level NOx concentrations and Critical
Ebury Square Development, Westminster
The developer has permission to construct 71 luxury apartments in central Belgravia. The 2-year contract
Goodman’s Fields, London
The client is currently developing the Goodman’s Fields site which will be a mixed use
Queensland Road Development, London
Kier London has signed a GBP 15m enabling works contract for the development of the
Channel Tunnel Rail Link – Rail Link Engineering
Southdowns staff began working with RLE in 1997 at the early stage of detailed design.